What should be paid attention to when installing plate heat exchangers?
1. After unpacking the plate heat exchanger, check item by item according to the packing list. If the requirements are not met, the supplier shall solve them in time.
2. The plate heat exchanger is designed with lifting holes for lifting and lifting. Before lifting, please select the wire rope according to the quality indicated on the nameplate.
3. The plate heat exchanger should be placed horizontally, and should be placed in a place where there is no pipe or other equipment blockage, so that there is about 1 meter of operating space around the equipment for easy maintenance.
4. If the outlet pressure of the plate heat exchanger pump is greater than the pressure of the equipment, please install a pressure reducing valve in the pipeline where the fluid enters the equipment.
5. If the plate heat exchanger is equipped with a pressure control valve, it should be installed on the water inlet pipe of the equipment instead of the water outlet.
6. Before installation, the inlet and outlet pipes of the plate heat exchanger should be cleaned to prevent sand and gravel, oil pollution, welding debris and other debris from entering the equipment, so as not to cause internal blockage or damage the plate.